This semester this FDP is a headache for me. Out of 4 phases of FDP, I'm responsible in handling one of the phases; reservoir engineering. SO much things to do, so much things to find with infinite uncertainties (mind you, we're dealing with subsurface. Nothing can be seen with bare eyes). And in spite of that, my team is blessed with a super-great supervisor, and of course that comes in a package with some other drawbacks. Workloads and workloads. And yes, insults once in a blue moon. But who would mind that for a perfection? Only loser does.
May Allah blessed me with exceptional strength and motivation to work this out for me and my team.
Source here.
0 commentaire:
Post a Comment